03 · Flooring installation and renovation

Floors that are flat, quiet and built to last.

A good floor starts under the floor. Levelling, vapour barrier, underlayment, laying direction: the preparation decides how long the finish lasts and how every step feels.

A-03Plan · HerringboneScale 1:25

Included

What a flooring project includes

Every item is described in the quote. Nothing is left to interpretation.

  • Removal and disposal of the old flooring
  • Subfloor inspection, repair and levelling
  • Hardwood and engineered wood, nailed or glued
  • Luxury vinyl and laminate flooring
  • Ceramic and porcelain tile, uncoupling membrane
  • Baseboards, quarter-round, thresholds and transitions

How it unfolds

How it works.

  1. 01

    On-site assessment

    Subfloor condition, moisture, unevenness: we check before we price.

  2. 02

    Choosing the flooring

    Based on the room, traffic and your budget, we point you to the right material.

  3. 03

    Preparation and installation

    Material acclimatization, substrate preparation, installation to chalk line and laser.

  4. 04

    Finishing and clean-up

    Baseboards, transitions, sealant where needed, then a full clean-up.

Common questions

Your questions, answered.

All questions

Hardwood can be sanded and refinished several times; engineered wood handles basements and radiant heat better; vinyl stands up to water and pets. We advise you based on the room and real-life use.

Yes, furniture has to be moved out. If you can’t do it yourself, tell us: we include the moving in the quote.

Sometimes, if the substrate is sound and flat. In most cases, removing the old flooring gives a better result and avoids height problems at doorways.

Ready to talk?

It takes three minutes to describe your project. We get back to you in under 48 hours.

Behind LG Réno: two co-founders, present on every job site. Meet the team