04 · Demolition

A clean demolition is the first step of a good renovation.

A well-run demolition protects what stays, reveals what’s hiding behind the walls and leaves a site ready for what comes next. It’s a job of method, not brute force.

A-04Elevation · FramingScale 1:20

Included

What a demolition includes

Every item is described in the quote. Nothing is left to interpretation.

  • Selective demolition of kitchens, bathrooms and non-load-bearing partitions
  • Removal of flooring, tile and drywall
  • Protection of surfaces that stay and dust control
  • Container, sorting and legal disposal of debris at the ecocentre
  • Preliminary check for hazardous materials in older buildings
  • Site swept and ready for the next phase

How it unfolds

How it works.

  1. 01

    Visit and survey

    Load-bearing walls, plumbing, electrical, suspect materials: we identify everything before the first swing.

  2. 02

    Protection

    Floors covered, doorways sealed, traffic zones isolated.

  3. 03

    Methodical demolition

    Room by room, in order, with services safely shut off.

  4. 04

    Removal and clean-up

    Debris removed, site swept, ready for renovation.

Common questions

Your questions, answered.

All questions

Yes. Some clients have us do the demolition and then hand the rest to other trades. We hand over a clean, documented site.

In older buildings, we check before we start. If a hazardous material is confirmed, its removal has to be done according to current regulations by specialists: we guide you through that step.

We do, unless you already have one. Rental and disposal are written into the quote.

Ready to talk?

It takes three minutes to describe your project. We get back to you in under 48 hours.

Behind LG Réno: two co-founders, present on every job site. Meet the team